Planning and Transport — 16 November 2026
Meeting Agenda
| Meeting Date: | Monday 16 Nov 2026 |
|---|---|
| Time: | 19:30 |
| Councillors | Jon Aldridge Chairman, Angela Baker, Sarah Compton, Michael Gemmell Smith, Alan Layland, Margot McArthur, Stuart McGregor, Vince Parker, Angela Read Vice-Chairwoman, Michael Stockdale, Jeff Streets, Bob Todd. |
| Committee: | Planning and Transport |
| Venue: | Rickards Hall. 72a High Street Edenbridge, TN8 5AR Kent |
| Notes: | |
| Summary: |
Members of the District Council wish to state that although they will be considering planning applications at this meeting they would be reconsidering them at the district level, taking into account all relevant evidence and representations there.
Members are reminded to the Code of Conduct, and Appendix B - Registering interests and non participation.
Members of the public, and members with prejudicial interests on items on the Agenda, may make representations, answer, ask questions and give evidence at this meeting in respect of items on the Agenda. (This is the only opportunity for members of the public to make a contribution during the meeting.)
Both public and members are limited to three minutes per person to speak and the total time designated for public questions shall not exceed fifteen minutes unless directed by the Chairman of the meeting.
Demolition of a small storage building and the erection of a new outdoor extraction unit within the existing timber merchant site.
This application has now been amended, and a summary of the main changes are set out below:
The applicant has amended the red line (site location plan and proposed site plan) to exclude the public highway.
Status: Granted
Status: Granted
Status: Granted
Erection of dwellings with a minimum of two or maximum of two dwellings and associated ancillary works
Recommendation: Members objected to this application and commented:
Members objected to this application and commented:
- The location is not sustainable
This remains the decisive issue, and it is confirmed by Kent Highways. In its consultation response of 2 November 2026, KCC Highways states that the site “remains in a relatively unsustainable location,” that the route to the nearest bus stop “lacks a continuous footway and is unlit,” that it is “unlikely that future residents would make regular use of public transport,” and that “the majority of journey would be undertaken by private car,” such that the proposal “does not fully align with Policy TR3 of the National Planning Policy Framework.”
This simply re-states the conclusion that led to the previous refusal. In determining 26/01783/PIP the Council correctly found that there are no footways on this 40mph section of Marsh Green Road, that the occupiers “would not realistically walk” to Edenbridge that the nearest bus stop is distant with a very limited service, that the railway stations are some 2.7km and 3.5km away, and that “a vast majority of trips are likely to be made by private the siting is unsustainable.”
The present application does nothing to change this. It removes the pedestrian and cycle link that the Council was assessing last time, and instead relies on an existing, unlit and unsurfaced footpath of some 920m (which, on the applicant’s own Flood Risk Assessment, crosses Flood Zones 2 and 3 and is subject to surface-water flooding), together with an anecdotal “hail-and-ride” bus arrangement. The Council had already concluded that occupiers would not realistically use such routes. The revised scheme therefore represents a retreat from, not an improvement on, the sustainability position previously found to be unacceptable.
The proposal conflicts with the settlement strategy of the adopted development plan, which directs new housing to sustainable locations within defined settlements — Core Strategy Policy LO1 (Distribution of Development) and Policy LO8 (The Countryside and Rural Economy) — and with ADMP Policy SC1 and the sustainable-transport objectives of the NPPF. The site is not an allocated housing site. Granting permission in principle for car-dependent housing in this location would be contrary to both the development plan and the NPPF and would be inconsistent with the Council’s own recent refusal of the same proposal on the same land.
- Flood risk and the absence of a Sequential Test
The whole of the application site lies within Environment Agency Flood Zones 2 and 3, and residential development is a “more vulnerable” use. The applicant’s Flood Risk Assessment (Tetra Tech, v04) concludes that the site floods across its entirety in the modelled scenarios and that the main vehicular access floods in events above the 1-in-100 defended event.
The Council is concerned that no Sequential Test has been undertaken. The national policy approach requires development to be steered to areas at the lowest risk of flooding, and the burden is on the applicant and the Council to demonstrate that there are no reasonably available sites at lower flood risk — a test this submission does not attempt and which, given the availability of sequentially preferable sites across the district, it is unlikely to pass. Southern Water’s response expressly supports the application of the sequential and exception tests and draws attention to the “high-risk flood zone” and to the need for a flood-resilient foul drainage solution on this site.
The Council also notes that:
the Flood Risk Assessment is internally inconsistent (fluvial risk is rated “High” in Table 6-1 but “low to medium” at paragraph 7.2.9; the EA’s own data response at Appendix A states that the majority of the site lies within Flood Zone 1), which reduces the weight that can be given to it; and the FRA records that the site falls within the Upper Medway Internal Drainage Board district and that the IDB was consulted but had not responded, while neither the Environment Agency nor the IDB appears on the District Council’s consultee list for this application.
The Council asks that the District Council consult the Environment Agency and the Upper Medway Internal Drainage Board before any determination, and that it satisfies itself that the Sequential Test can properly be passed. In the Council’s view, the flood-risk position reinforces the conclusion that this is the wrong location for new housing.
- The Green Belt case must be re-made under the current National Planning Policy Framework
The Town Council acknowledges that, in determining 26/01783/PIP, the Council accepted the principle of two dwellings on the site as previously developed land under the then-applicable Green Belt policy. However, the applicant confirms that the NPPF was replaced in August 2026, and the covering letter simply asserts compliance with the new framework without demonstrating it. The onus is on the applicant to re-justify the Green Belt and previously-developed-land / “grey belt” position (including any applicable “golden rules”) against the current framework, which the submission does not do. The Council further observes that the replacement of an open yard with two dwellings and their associated domestic curtilage, vehicles and paraphernalia would have a permanent effect on the openness of the Green Belt and would represent encroachment into the countryside, which the decisionmaker must weigh.
- Land-use compatibility and loss of rural employment
The dwellings would adjoin an operational farmyard and existing commercial/industrial units. The District Council’s Environmental Protection officer advises that noise from these operations may affect the proposed dwellings (requiring compliance with BS8233) and that a contaminated-land assessment is required. These are “agent of change” / compatibility considerations relevant to whether residential use is acceptable in principle on this land. The proposal would also displace an established rural employment use (the “Existing Evidence Note” identifies occupiers including Graceful Gardens and container-based storage), contrary to the rural-economy aims of Policy LO8.
- Impact on the setting of a listed building (Gabriels Manor)
Gabriels Manor, which lies a short distance to the east of the application site, is a Grade II listed building (National Heritage List for England entry 1273530). The application fails to identify this heritage asset at all - the application form again declares that there are no constraints - and no Heritage Statement or assessment of the impact of the proposal on the significance and setting of the listed building has been submitted.
Avison Young have asked for any comments you may have on the attached Consultation letter regarding their proposed base station upgrade at CPA Engineering Fircroft Way Edenbridge TN8 6EN
You can send any comments by email or post.
- Annex 1 is confidential and is not included in the published papers.
- Annex 2 is confidential and is not included in the published papers.
A series of improvements will take place for the Four Elms crossroads. Providing more advance warning signs, extra road markings and the replenishment of existing road markings. This will take place over a series of night time road closures.
Members and residents are reminded that highways faults need to be reported direct to KCC Highways via its website; link below. Problems reported can be tracked via KCC website. A full list of reports can be obtained from the portal but you need to set up an account.